Construction of the water drain in a private sector in the Sovki residential community
Concern’s Project Sites
Construction of the water drain in a private sector in the Sovki residential community.

Construction period: April 2005-December 2008

Pipeline total length – 3 349 m.

Construction of 158 extinguishing chambers and viewing wells.
The pipeline of  D 225 mm polyethylene pipes is laid by a method of horizontal directed drilling (HDD).
Vermeer Navigator D36x50 Installation of VERMEER Manufacturing Co. is applied.

Works are conducted in the conditions of dense construction, of narrow streets.

The horizontal directed drilling method does not interfere the usual rhythm of life of inhabitants of residential community, does not cause harm to environment.

 
 
 
Detailed contact information
Question to the expert
Site map

© «Concern «KyivPidzemShlyakhBud», 2009
Site is created by ADV-DVA Company in 2009
Support and Promotion by WebPromotion
«Concern «KyivPidzemShlyakhBud»
Tel.:+380 (44) 253-00-02
tel: +380 (44) 253-00-31
office@kpsb.com.ua